In Custom Project with 4 tasks.
in each retest task :
If I read the IS / OOS period in the Data settings in the retest task, the IS / OOS period are not correct
Please the see the link video :
https://drive.proton.me/urls/FT49J7Z61W#vzw1TEZ0fSDQ
Description changed:
In Custom Project with 4 task, one Build , one retest, one build, then a second retest task.
in the 4th task (the second retest task) :
When I read the IS / OOS period in the Data settings in the retest task, the IS / OOS period are not correct
Please the see the link video :
https://drive.proton.me/urls/FT49J7Z61W#vzw1TEZ0fSDQ
Description changed:
In Custom Project with 4 tasks, one Build , one retest, a second build, then a second retest task.
in the 4th task (the second retest task) :
When I read the IS / OOS period in the Data settings in the retest task, the IS / OOS period are not correct
Please the see the link video :
https://drive.proton.me/urls/FT49J7Z61W#vzw1TEZ0fSDQ
Attachment image-0.png added
Description changed:
In Custom Project with 4 tasks, one Build , one retest, a second build, then a second retest task.
in retest task :
When I read the IS / OOS period in the Data settings in the retest task, the IS / OOS period are not correct
Please the see the link video :
https://drive.proton.me/urls/FT49J7Z61W#vzw1TEZ0fSDQ
Description changed:
In Custom Project with 4 tasks.
in each retest task :
If I read the IS / OOS period in the Data settings in the retest task, the IS / OOS period are not correct
Please the see the link video :
https://drive.proton.me/urls/FT49J7Z61W#vzw1TEZ0fSDQ