I have a project that was created in B118.In task Build01, I set the EURUSD_M1 for the period 2008.1.1 - 2013.12.31 with IS / OOS.I run the project - running on the given period.After closing and running SQX, I open the project.In task Build01, the EURUSD_M1 symbol has a period of 2003.5.5-2019.3.1 and a canceled OOS.
So, in BUILD01, change to EURUSD_DUK with setup 2008.1.1 - 2013.12.31 with IS / OOS.Once closed and opened, it is set to EURUSD_M1, 2003.5.5 - 2019.3.1 without OOS.
I make changes when the story is not running.
The project behaves as if it were locked into some changes.