Hi Mark,
At the moment two options for databank synchronisation is possible.
a) file
b) memory
If I set to memory synchronisation I have a problem if the SQ crashes. All my strategies are lost.
With file synchronisation it is slower.
A good feature will be if the programm synchronisize the strategies after n- calculation.
For example 10000 calculations. If the sq crashes over night not all is lost.
(Best is to make this parameter configurable)
thomas