Hi,
sometimes the SQ don´t recognise the multitimeframe setting in the Workflows.
I have done the following test
1) I have written a multitimeframe workflow
(See attached Q62b EURUSD M15H1H4)
Pic: 1a multitimeframe project mc test.PNG
Look into MC test all is ok
I looked on harddisk (1b only one project in project folder.PNG)
=> all is ok.
I stopped SQ
2) I go into Projectfolder and copied multitimeframe Project
(2 stopped SQ and copied projects.PNG)
3) I Started SQ
The Workflows are loaded-
(3 after restart SQ.PNG)
4) I looked into Workflows
Some Projects are ok but some Projects have problems with multitimeframe in MC test. See Picture
(4 some worksflows have problems.PNG)
=> The multitimeframe is missing.
thomas