Mass-modify symbols in custom project

If a symbol is changed in custom projects (either manually or with mass-modify) the start and end date is changed to default settings.



Also spread and slippage are reset.


So my request is to have an option to fix the settings (start date, end date spread, slippage etc.) and do not change (if the symbol is changing).


Example:


EURUSD_H1 start date: 01.01.2003, end date: 01.01.2011, spread 1, slippage 4


now change EURUSD -> GBPUSD: either manual or mass-modify:


Now: 
GBPUSD_H1 start date: 01.01.2003, end date: 15.11.2020 (instead 01.01.2011), spread 2 (instead 1), slippage 1 (instead 4)


Background of request:
If I do f.e. mass modify to change a project with 26 tasks from EURUSD in GBPUSD all the symbols are now changing with new release. This is very well!


But, I have again to go through of every 26 tasks to modify f.e. the end date, because it did a reset to default (f.e. last day of end date: 15.11.2020).


Bottom line:
If I would have the requested option, I could change everything with mass modify without any manual change!


Thanks for help. and your understanding!
Christian


 

Attachments
  • Votes +2
  • Project StrategyQuant X
  • Type Bug
  • Status Fixed
  • Priority Normal

History

CW
#1

ChrisWhite

15.11.2020 19:12

Task created

h
#2

hankeys

16.11.2020 09:35
Voted for this task.
TT
#3

Tamas

16.11.2020 10:12

Status changed from New to In progress

TT
#4

Tamas

18.11.2020 05:50

Attachment after.jpg added

Attachment before.jpg added

after.jpg
(155.71 KiB)
before.jpg
(153.72 KiB)
Mass modification functionality changes only symbols and timeframes, nothing else.


Can you please attach the problematic project config to reproduce the problem ? 

TT
#5

Tamas

18.11.2020 05:50

Status changed from In progress to Waiting for information

CW
#6

ChrisWhite

18.11.2020 06:59

Attachment before.jpg added

Attachment after.jpg added

Attachment Retest strategies_sample_for_testing.cfx added

Retest strategies_sample_for_testing.cfx
(3.67 KiB)
after.jpg
(30.53 KiB)
before.jpg
(30.43 KiB)

Good morning,


thanks for taking care so quickly! That is really very professional!


Regarding the issue:


This happens not in builder. It appeares in tasks like "retest strategies". Here is a sample attached. I was simply changing AUDNZD through CADCHF. It doesn't matter which symbol it is.


Please see.


I hope that helps for clarification.


Have a nice day. 

Christian

TT
#7

Tamas

20.11.2020 08:43

Type changed from Feature to Bug

Status changed from Waiting for information to In progress

TT
#8

Tamas

20.11.2020 15:10

Status changed from In progress to Waiting for information

It looks that you are replacing symbols with different date range.


This feature is replacing symbols without checking the dates.

Later when you open the project some auto-corrections are done.

SQX is checking if there are available data for range set on Data tab, if not then reseting the dates.


Please make sure that you have CADCHF data available from 2003 same as you have for EURUSD. Then it should work fine.

TT
#9

Tamas

24.11.2020 12:08

Status changed from Waiting for information to Fixed

CW
#10

ChrisWhite

24.11.2020 12:52
Thanks for your reply.


Yes, that is clear. But if the changed symbol (here: CADCHF) has no older data, then there is a problem.


What I have experience is that, besides of autocorrection (which is a clear procedure for me, when data is not available), the "date to" is changing to the lastest data available! And this change is not requested, but performed due to autocorrection.


Example: from above


1.) I want to test a symbol AUDCAD FROM: 2003.8.4 TO: 2011.01.01.


2.) Then I change to CADCHF. The result is: FROM 2006.1.8 TO: 2020.8.26.


3.)

DATE FROM -> OK


a.) It performs an autocorrection of CADCHF to DATE FROM: 2006.1.8 (before 2003.8.4) , because no older data of CADCHF is available. That is clear and ok.


DATE TO -> NOT OK


b.) It makes an autocorrection of CADCHF to DATE TO: 2020.8.26 (before 2011.1.1). This is in my understanding not ok. The reason is, because I wanted the pairs to retest until a specifiy date, here: 2011.01.01. So if I do a "mass modify" to change symbol A in symbol B. The result is, that it changes (autocorrects) the DATE TO from 2011.1.1 to 2020.8.26. That is a not wanted behavior, because I do not want a change in the DATE TO field. So my interpretation of the bug is: If the dates of the changed symbol do not match-> reset DATE TO AND DATE FROM to the maximum available dates. But I only want a autocorretion for dates, that are not possible to reach because of missing data. If the data is there, in this example this is DATE FROM, then nothing should be autocorrected!


I hope that help for clarification!


Have a nice day, Christian